The gymnasium of Yahara Junior High School was renovated for structural seismic strengthening. A new construction method was adopted in order to replace a precast shell roof with a steel frame truss roof. Safety was ensured through the effects of reinforcement, and the bright ceiling surface and a sense of openness were also obtained.
Location |
Nerima-ku, Tokyo |
---|---|
Site Area |
4,923m2 |
Floor Area | 776m2 |
Building Type |
Junior High School |
Structure | RC |
Story | 2F |
Completion |
2004 |
Memo |
Acquired seismic diagnosis evaluation |